Our Design-Build Process
- 01
Step 1 of 6
Discovery & Pre-Construction
We learn the operation the building has to support: equipment, clear height, doors, cranes, and the date that matters. You get a straight read on fit, risk, and what a real budget needs.
- 02
Step 2 of 6
Design & Nucor Engineering
The program becomes a Nucor model. Loads, reactions, crane data, and door openings are in the engineering before steel is released. Manufacturer engineering is the point of an authorized builder.
- 03
Step 3 of 6
Budget & Contract
The number matches the scope. Allowances are labeled. Exclusions are labeled. One contract, one point of accountability, from that signature forward.
- 04
Step 4 of 6
Permitting & Site Work
Drawings go to the authority having jurisdiction. Anchor bolts, slab design, and site access are sequenced so the steel does not arrive to an unready pad.
- 05
Step 5 of 6
Fabrication & Erection
Nucor fabricates the system. Wolf Works crews erect it: frames, secondary steel, roof, and walls, with our superintendents on the job.
- 06
Step 6 of 6
Closeout & Handover
Doors operate, punch items are listed, and you get the documents that belong with the building. We do not disappear at dried-in.
Process questions
No. Discovery can start from a program and a site. If drawings are already stamped, submit them and we will bid the set.
Nucor engineers the pre-engineered building system. Wolf Works coordinates the program, the permit path, the slab and doors, and the erection.
Unlike the traditional model where you're left coordinating a separate building supplier, erector, and door company, Wolf Works gives you single-source accountability from your initial estimate all the way to turning over the keys.

Have a project on the board?
Whether you’re still sizing the building or already have stamped drawings, our pre-construction team will give you real numbers and a realistic schedule.